City of Bonners Ferry Moyie Dam Silt Removal

Project Date: 2019

Project scope:
The City of Bonners Ferry required dredging of the forebay of the Moyie Dam. KCS removed 11,000 yards of silty debris from the forebay of the dam, using a 140 ton Manitowoc 3900W Series II from the shore and a 80 ton Terex HC80 crane from a floating plant. The cranes and floating plant are owned by KCS.